21161. The term used for major important roads of a country is-
country road
urban road
highway
none of these
21162. A water-bound macadam road is an example of- [BGFCL-17]
rigid pavement
semi-rigid pavement
flexible pavement
none
ব্যাখ্যা: A pavement which consists of a mixture of a asphalticor bituminous matedrial and aggregate placed on a good quality and compacted granular material is termed as flexible pavement. Example- Water bound macadam road.
21163. What is the weight for 1 cft RCC slab of thickness 0"-4"? [MES-16]
150 lb
100 lb
50 lb
60 lb
ব্যাখ্যা: ব্যাখ্যা 4''*150/12=50 lb
21164. নিচের কোন ক্ষেত্রে নিট সিমেন্ট ফিনিশিং করা হয় না?
মেঝে
স্কাটিং
ড্রেন
টয়লেট
ব্যাখ্যা: সিমেন্ট ফিনিশিং হচ্ছে স্বল্প ব‌্যয়ের একপ্রকার ফ্লোর ফিনিশিং। এজন‌্য মেঝের ক্ষেত্রে নিট সিমিন্ট ফিনিশিং করা হয় না। কারণ মেঝেতে নিট সিমেন্ট ফিনিশিং করলে ভালো মসৃণ হয় না
21165. প্রি-কাস্ট পাইলের দৈঘর্‌্য
3-15m
15-440m
4.5-30m
2-40m
ব্যাখ্যা: যেখানে অতিরিক্ত ভারবহন করার প্রয়োজন হয় সেখানে প্রি-কাস্ট পাইল ব‌্যবহার করা হয়। এ পাইলের ব‌্যাস ৩৫-৬৫সেমি
21166. The roads connecting capital cities of states are called-
national highway
state highway
express way
capital highway
21168. Asphalt cement usually used in Bangladesh has the penetration range of- [MES-16]
AC 40-50
AC 85-100
AC 60-70
AC 120-150
21169. For the water-bound macadam road, the recommended camber is-
1 in 24 to 1 in 30
1 in 30 to 1 in 48
1 in 48 to 1 in 80
1 in 80 to 1 in 120
21171. The slope of the line joining the crown and edge of the road surface is known as-
cross-fall
camber
cross-slope
any one of these
21173. How many parts of a pavement? [BREB-17]
3
5
4
6
ব্যাখ্যা: There are 4 part of a pavement such as subgrade, sub- base. Base course and surface course or wearing course,
21175. The superstructure of a road is called-
wearing layer
wearing course
road surface
any one of these
21180. The camber recommended for water-bound macadam roads is-
1 in 24 to 1 in 30
1 in 30 to 1 in 48
1 in 48 to 1 in 60
1 in 60 to 1 in 80