MCQ
1161. For 100 sq. m cement concrete (1: 2: 4) 4 cm thick floor, the quantity of cement required, is
0.90 m3
0.94 m3
0.98 m3
1.00 m3
1162. The height of the sink of wash basin above floor level is kept
60 cm
70 cm
75 cm to 80 cm
80 cm
1163. Berms are provided in canals if these are
Fully in excavation
Partly in excavation and partly in embankment
Fully in embankment
All the above
1164. Pick up the incorrect statement from the following:
The built up covered area at the floor level of any storey of a building is called plinth area
The usable covered area of the rooms of any storey of a building is called carpet area
The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area.
None of these
1165. The brick work is measured in sq metre, in case of
Honey comb brick work
Brick flat soling
Half brick walls or the partition
All the above
1166. The order of booking dimensions is
Length, breadth, height
Breadth, length, height
Height, breadth, length
None of these
1167. The expected out turn of half brick partition wall per mason per day is
1.5 m3
2.0 m3
4.0 m2
5.0 m2
1168. The weight of an item is measured correct to nearest
0.25 kg
0.50 kg
0.75 kg
1.00 kg
1169. If tensile stress of a steel rod of diameter is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
30 D
39 D
50 D
59 D
1170. The floor area includes the area of the balcony up to
100%
75%
50%
25%
1171. Size, capacity and materials need be specified for
Bib-cocks
Stop-cocks
Ball valves
All the above
1172. The volume is measured correct to the nearest
0.01 cum
0.02 cum
0.03 cum
0.04 cum
1173. The unit of measurement is per quintal for the following:
Collapsible gates with rails
Rolling shutters
Expanded metal wire netting
M.S. reinforcement of R.C.C. works
1174. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
1.00 m3
1.25 m3
1.50 m3
1.75 m3
1175. Pick up the incorrect statement regarding a master trap from the following:
It is provided in between the lower end of the house drain and the street sewer
It is provided a cleaning eye at the top of the trap
The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
The water seal is less than that of ordinary traps
1176. The slope of the outlet of 'P trap' below the horizontal is kept
8°
10°
12°
14°
1177. The item of steel work which is measured in sq.m, is
Collapsible gates
Rolling shutters
Ventilators and glazing
All the above
1178. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
100 mm
150 mm
200 mm
175 mm
1179. For 12 mm thick cement plastering 1: 6 on 100 sq.m new brick work, the quantity of cement required, is
0.200 m3
0.247 m3
0.274 m3
0.295 m3
1180. The damp proof course (D.P.C.) is measured in
Cub. m
Sq. m
Metres
None of these