MCQ
61. Gantt chart is mostly used for-
routing
follow up
scheduling
inspection and quality control
62. Indirect expenses include-
factory expenses
selling expenses
administrutive process
all the above
63. In a production process which should be taken first?
control
operation & maintenance
planning
none
64. The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
65. PERT analysis is based on-
optimistic time
most likely time
pessimistic time
all of the above
66. CPM -
Production Planning
synthesising in concepts
is built of activities oriented program-mess
is based on one time extimate is used for repetitive works
all of the above
67. Break even analysis consists of-
fixed expenses
variable cost
fixed and variable cost
operation cost
68. Direct expenses include-
factory expenses
selling expenses
administrative expenses
none of there
69. Key to chart is provided in-
Man machine chart
The load chart
The progress chart
Gantt chart
70. A CPM family includes-
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
CPS (Critical Path Scheduling)
all of the above
71. The correct sequence of operations in production planning and control is—
Routing-Scheduling-Dispatching-Follow up
Scheduling-Routing-Dispatching-Follow up
Dispatching-Routing-Scheduling-Follow up
Routing-Scheduling-Follow up Dispatching
72. Product layout is used for-
job production
batch production
mass production
any one of the above
73. Critical path method- -
helps in ascertaining time schedules
makes better and detailed planning possible provides a standard method for
communicating project plans schedules performance
all of the above
74. PERT/CPM, techniques can be used for following applications—
once through project
maintenance jobs
research and development
all non-technical jobs
all of the above
75. Master schedule is prepared for-
Single product continuous production
Multi product batch production
Assembly product continuous production
Single product batch production
76. Both Rowan plan and 50-50 Halsey plan will provide the same earning-- the standard time.
one fourth
one-half
equd to
twice
77. In break even analysis, total cost consists of-
fixed cost + sales revenue
variable cost + sales revenue
fixed cost + variable cost
fixed cost+ variable cost + profit
78. The types of layout for machine shop are—
2
3
5
4
79. The works study is done by means of-
planning chart
stop watch
process chart
any one of above
80. Centralized and decentralized are the types of-
routing
scheduling
dispatching
follow up