Image
MCQ
63. In break even analysis, total cost consists of-
fixed cost + sales revenue
variable cost + sales revenue
fixed cost + variable cost
fixed cost+ variable cost + profit
65. CPM -
Production Planning
synthesising in concepts
is built of activities oriented program-mess
is based on one time extimate is used for repetitive works
all of the above
67. Critical path method- -
helps in ascertaining time schedules
makes better and detailed planning possible provides a standard method for
communicating project plans schedules performance
all of the above
69. Master schedule is prepared for-
Single product continuous production
Multi product batch production
Assembly product continuous production
Single product batch production
73. PERT/CPM, techniques can be used for following applications—
once through project
maintenance jobs
research and development
all non-technical jobs
all of the above
74. The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
80. The correct sequence of operations in production planning and control is—
Routing-Scheduling-Dispatching-Follow up
Scheduling-Routing-Dispatching-Follow up
Dispatching-Routing-Scheduling-Follow up
Routing-Scheduling-Follow up Dispatching