Image
MCQ
501. Work study is most useful--
where production activities are involved
in judging the riding of machines
in improving industrial relations
in judging the output of a man and improving it
507. The production scheduling is simpler and high volume of output and achieved in the case of--
product layout
process layout
fixed position layout
a combination of luse and process layout
512. Critical path method- -
helps in ascertaining time schedules
makes better and detailed planning possible provides a standard method for
communicating project plans schedules performance
all of the above
513. Work study is concerned with- -
improving present methad und finding standard time
motivation of workers
improving production capability
improving production planning and control
515. The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
517. The critical path of a network represents--
the minimum time required for completion of project
the maximum time required for completion of project
maximum cost required for completion of project
minimum cost required for completion of project