MCQ
501. Gantt chart is mostly used for-
routing
follow up
scheduling
inspection and quality control
502. The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
503. Break even analysis consists of-
fixed expenses
variable cost
fixed and variable cost
operation cost
504. Centralized and decentralized are the types of-
routing
scheduling
dispatching
follow up
505. The production scheduling is simpler and high volume of output and achieved in the case of--
product layout
process layout
fixed position layout
a combination of luse and process layout
506. Both Rowan plan and 50-50 Halsey plan will provide the same earning-- the standard time.
one fourth
one-half
equd to
twice
507. Work study is concerned with- -
improving present methad und finding standard time
motivation of workers
improving production capability
improving production planning and control
508. Work study is most useful--
where production activities are involved
in judging the riding of machines
in improving industrial relations
in judging the output of a man and improving it
509. Bin card is used in--
admimatrative wing
workshop
foundry shop
stores
510. The types of layout for machine shop are—
2
3
5
4
511. PERT analysis is based on-
optimistic time
most likely time
pessimistic time
all of the above
512. Direct expenses include-
factory expenses
selling expenses
administrative expenses
none of there
513. Key to chart is provided in-
Man machine chart
The load chart
The progress chart
Gantt chart
514. Indirect expenses include-
factory expenses
selling expenses
administrutive process
all the above
515. The works study is done by means of-
planning chart
stop watch
process chart
any one of above
516. Critical path method- -
helps in ascertaining time schedules
makes better and detailed planning possible provides a standard method for
communicating project plans schedules performance
all of the above
517. Product layout is used for-
job production
batch production
mass production
any one of the above
518. In a production process which should be taken first?
control
operation & maintenance
planning
none
519. Master schedule is prepared for-
Single product continuous production
Multi product batch production
Assembly product continuous production
Single product batch production
520. The critical path of a network represents--
the minimum time required for completion of project
the maximum time required for completion of project
maximum cost required for completion of project
minimum cost required for completion of project