Image
MCQ
21. How many number of bricks require for one cum. brick work?
420
400
406
415
22. The volume of cement in one bag is
1.00 cft
1.50 cft
1.25 cft
1.15 cft
23. The open wells or dug wells are also known as-
shallow wells
draw wells
percolation
all of those
24. Number of bricks require for 1 cubic meter of concrete work at 1:1.5:3 ratio is
300
350
246
346
25. What is the unit weight of cement?
1440 kg/cum
1620 kg/cum
1200 kg/cum
1500 kg/cum
26. What is the minimum temperature for burning of bricks?
300°-500°C
7000-1000° C
500°-700°
10000-1200°
27. Main element of biogas is -
CO2
Water
Crowding
CH4
28. What is the standard width of corrugated sheet?
85 cm
80 cm
70 cm
75 cm
29. What is the hook length for steel reinforcement of diameter d?
2d
9d
6d
16d
30. The pile transfers load as a pier is-
Surface asphalt
lake asphalt
Rock asphalt
All of above
31. Which pile acts as retaining wall?
Anchor pile
Felder pile
Bearing pile
Batter pile
32. When first class brick is sunk 24 hours in water how much water will absorbed of its weight ?
1/3
1/6
1/4
1/7
33. Effective grain size of soil is-
D20
D40
D10
D50
34. What is the weight for 1 SQF RCC slab of thickness 0"-4"?
150 lb
100 lb
50 lb
60 lb
35. Chain survey is most appropriate for
small place
Palin and open place
when plain needed for a large scale
all of above
36. If SPT of clayey soil is 2 then the soil is -
Soft
Medium
Hard
Stiff
37. Void ratio (e) is -
vv/v
vv/vs
V/V
V/Vv
38. Shallow tube well can pump water from a depth of -
20-25m
45-55m
40-50m
50-60m
39. Which dam is suitable for hilly area?
dry hill
hydraulic hill
composite hill
none the above
40. Number of bricks required for herring bone bond over 100 sq. area is _
5400
5200
5300
5600