প্রডাকশন প্লানিং এন্ড কন্ট্রোল MCQ
41. The process layout is best suited where-
specialisation exists
machines are arranged according to sequence of operation
few number of non-standardised units are to be produced
mass production is envisaged
42. Work study is most useful--
where production activities are involved
in judging the riding of machines
in improving industrial relations
in judging the output of a man and improving it
43. In manufacturing management, the term 'Dispatching' is used to desc-
dispatch of sales order
dispatch of factory mail
dispatch of finished product of the user
dispatch of work orders through shop floor
44. Process layout is employed for-
batch production
continuous type of product
effective utilisation of machines.
all of the above
45. PERT analysis is based on--
optimistic time
most likely time
pessimistic time
all of the above
46. Bin card is used in--
admimatrative wing
workshop
foundry shop
stores
47. A big advantage of PERT over Gantt charts is that in the former case--
activities and events are clearly shown
early start and late finish of an activity are clearly marked
activity times are clear
interrelationship among activities is clearly shown
48. The critical path of a network represents--
the minimum time required for completion of project
the maximum time required for completion of project
maximum cost required for completion of project
minimum cost required for completion of project
49. Break-even analysis can be used for-
short run analysis
long run analysis
average of above two run analysis
there is no such criterion
50. Work study is concerned with- -
improving present methad und finding standard time
motivation of workers
improving production capability
improving production planning and control
51. Product layout is employed for--
batch production
continuous production
effective utilization of machine
all of the above
52. Travel charts provide--
an idea of the flow of materials at various stages
a compact estimate of the handling which must be done between various work sections
the information for changes required in rearranging material naterial handling equipment
an approximate estimate of the handling which must be done at a particular station
53. The most important objective behind plant layout is—
overall simplification, safety of integration
overall simplification, safety of integration
maximum travel time in plant
to provide conveniently located shops
54. For a product layout the material handling equipment must-
have full flexibility
employ conveyor belts, trucks, tractors etc.
be a general purpose type
be designed as special purpose for a particular application
55. The break-even point represents--
the most economical level of operation of any industry
the time when unit can run without i loss and profit
time when industry will undergo loss
the time when company can make maximum profits
56. ABC analysis deals with-
analysis of process chart
flow of material
ordering schedule of job
controlling inventory costs money
57. Gnatt chart provides information about the-
material handling
proper utilisation of manpower
production schedule
efficient working of machine
58. A low unit cost can be obtained by following一
product layout
funcional layout
antomatic material handling equipment
specialisation of operation
59. Actual performance of a task is called--
an event
duration
an activity
one of of these
60. The production scheduling is simpler and high volume of output and achieved in the case of--
product layout
process layout
fixed position layout
a combination of luse and process layout