প্রডাকশন প্লানিং এন্ড কন্ট্রোল MCQ
64. Critical path method- -
helps in ascertaining time schedules
makes better and detailed planning possible provides a standard method for
communicating project plans schedules performance
all of the above
66. In break even analysis, total cost consists of-
fixed cost + sales revenue
variable cost + sales revenue
fixed cost + variable cost
fixed cost+ variable cost + profit
71. The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
73. PERT/CPM, techniques can be used for following applications—
once through project
maintenance jobs
research and development
all non-technical jobs
all of the above
75. Master schedule is prepared for-
Single product continuous production
Multi product batch production
Assembly product continuous production
Single product batch production
76. CPM -
Production Planning
synthesising in concepts
is built of activities oriented program-mess
is based on one time extimate is used for repetitive works
all of the above
77. The correct sequence of operations in production planning and control is—
Routing-Scheduling-Dispatching-Follow up
Scheduling-Routing-Dispatching-Follow up
Dispatching-Routing-Scheduling-Follow up
Routing-Scheduling-Follow up Dispatching