8545. contour survey is normally done by using
level machine
total station
theodolite
tachometer
8551. the surface ready to receive the road structure is called
formation
improved subgrade
subgrade
toe
8554. Camber in the road is provided for
Effective drainage
Counteracting the centrifugal force
Having proper sight distance
All of the above
8555. For highway geometric design purpose the speed used is
15th percentile
50th percentile
85th percentile
98th percentile
8557. Wheels of a rolling stock are provided flanges on
outer side
inner side
neither side
neither side
8558. Maximum number of vehicles can be parked with
parallel parking
30° angle parking
45° angle parking
90° angle parking