Image
প্রডাকশন প্লানিং এন্ড কন্ট্রোল MCQ
1. In Lincoln plan (one type of group Incentive plan), the amount of the profit which an an employee receives in addition to the guaranteed basic300 pay/wages, is based on--
a standard rating system
a merit rating system
a job evaluation system
his individual performance performance
3. Which of the following incentive plansrensures a part of the swing to the worker and rest to the employer—
Emerson efficiency plan
Taylor plan
Halsey premium plan
all of the above
5. An optimum project schedule implies--
optimum útilization of men, machines and materials
lowest possible cost and shortest possible time for project
timely execution of project
to produce hest results under given constraints
16. Value engineering aims at finding out the-
depreciation value of a product
resale value of a product
major function of the item and accomplishing the same at least cost without change in quality
break even point when machine requires change