Image
MCQ
863. The walls which are necessary on the hill side of roadway where earth has to retained from-- slipping is knows as:
Retaining wall
Breast wall
Parapet wall
None of these
866. After pre-stressing process is completed, loss of stress occurs due to-
Shrinkage of concrete
Creep of concrete
Elastic shortening of concrete
All of the above
869. In a pre-stressed member, it is advisable to use:
Low strength concrete only
High strength concrete only
Low strength concrete but high tensile steel
High strength concrete and high tensile steel
870. The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick is known as:
Queen closer
Bevelled closer
King closer
Half-king closer
872. Which types of forces are generated during earthquake?
Vertical Shear
Horizontal Shear
Bending moment
Combination of both horizontal & vertical shear
879. The transverse reinforcements provided at right angles to the main reinforcements in a slab---
Distributed load
Resist the temperature stress
Resist the shrinkage stress
All of the above
880. The ratio of specific weight of a liquid to the specific weight of pure water at a standard temperature is called-
Density of liquid
Specific gravity of liquid
Compressibility of liquid
Surface tension of liquid