1041. নিচের কোনটি আর্দ্রতারোধী জ্বরে ব্যবহৃত হয়?
জিওটেক্সটাইল
ফোম
কটন
বিটুমিন
1042. The brick work is measured in sq metre, in case of
Honey comb brick work
Brick flat soling
Half brick walls or the partition
All the above
1043. Pick up the incorrect statement from the following:
Dimensions are measured to the nearest 0.01 m
Areas are measured to the nearest 0.01 sq.m
Cubic contents are measured to the nearest 0.1 cum
Weights are measured to the nearest 0.001 tonnes
1044. The unit of measurement is per quintal for the following:
Collapsible gates with rails
Rolling shutters
Expanded metal wire netting
M.S. reinforcement of R.C.C. works
1045. In case of laying gullies, siphons, intercepting traps, the cost includes
Setting and laying
Bed concreting
Connection to drains
All of these
1046. The height of the sink of wash basin above floor level is kept
60 cm
70 cm
75 cm to 80 cm
80 cm
1047. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
100 mm
150 mm
200 mm
175 mm
1048. The order of booking dimensions is
Length, breadth, height
Breadth, length, height
Height, breadth, length
None of these
1049. Pick up the incorrect statement regarding a master trap from the following:
It is provided in between the lower end of the house drain and the street sewer
It is provided a cleaning eye at the top of the trap
The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
The water seal is less than that of ordinary traps
1050. The item of steel work which is measured in sq.m, is
Collapsible gates
Rolling shutters
Ventilators and glazing
All the above
1051. বিটুমিনজাত সামগ্রীর বর্ণ কিরূপ?
কৃষ্ণ
শ্বেত
রক্তিম
কোনটি নয়
1052. The inspection pit or chamber is a manhole provided in a base drainage system
At every change of direction
At every change of gradient
At every 30 m intervals Book
All the above
1053. নিচের কোনটিতে বিটুমিন সম্পূর্ণরূপে দ্রবণীয়?
তারপিন
পানি
স্পিরিট
অ্যালকোহল
1054. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
1.00 m3
1.25 m3
1.50 m3
1.75 m3
1055. For 12 mm thick cement plastering 1: 6 on 100 sq.m new brick work, the quantity of cement required, is
0.200 m3
0.247 m3
0.274 m3
0.295 m3
1056. The 'centre line method' is specially adopted for estimating
Circular buildings
Hexagonal buildings
Octagonal buildings
All the above
1057. Pick up the incorrect statement from the following:
The built up covered area at the floor level of any storey of a building is called plinth area
The usable covered area of the rooms of any storey of a building is called carpet area
The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area.
None of these
1058. অবস্থাভেদে পিচ্ছিল কারক কয় ভাগে ভাগ করা যায়?
৫
৩
৪
২
1059. The correct Prismoidal formula for volume is
D [first area + last area + Even area + 2 odd areas]
D/3 (first area + last area + 4 Even area + 2 odd areas]
D/3 [first area + last area + 2 Even area + 4 odd areas]
D/6 [first area + odd areas]
1060. বাংলাদেশে কোন গ্যাস ক্ষেত্রে সর্বাধিক গ্যাস মজুদ আছে?
তিতাস
হবিগঞ্জ
হরিপুর
বাখরাবাদ