MCQ
4561. The highest point on the daily load curve represents-
average load
load factor
maximum load
none of the above
4562. Corona is affected by-
condition of atmosphere
line voltage
size & spacing of conductor
all of the above
4563. Which of the following is not the distribution system, normally used-
3 phase 4 wire
Single phase-3 wire
Single phase -4 wire
3 phase-3 wire
4564. Length of the cable is doubled, its capacitance C will be-
one-fourth
doubled
one-half
unchanged
4565. TStability of a system is not affected by-
Reactance of line
Losses
Reactance of generator
Output torque
4566. Capacitance of a transmission line is the result of-
Potential diference between the conductors
Current flow in both conductors
Current flow in either conductors
Charge per unit current
4567. Which distribution system is more reliable?
Ring main system
Tree system
Radial System
All are equally reliable
4568. The common fault is overhead distribution system is-
phase to phase fault
one phase to earth fault
all phase short circuited
none of the above
4569. Common declared distribution voltage in Bangladesh for low voltage circuit is-
230 Volts
250 Volts
440 Volts
380 Volts
4570. Permissible variation in power frequency in Bangladesh is-
±0.1%
±1%
±5%
±10%
4571. Potential difference to any equal charge is measured in,
coulomb
Ampere
joule
volt
4572. Which is used for power factor improvement?
Spring motor
Sychronous motor
Commutator motor
Squirrel case motor
4573. Routing means connecting-
Circuit or equipment to earth
Impent to earth
Circuit to earth
None of the above
4574. the minimum phase -neutral voltage at which corona occurs, is called-
critical disruptive voltage
visual critical voltage
fieash over voltage
none of the above
4575. Interference between a power line and a communication line is due to-
electromagnetic induction
electrostatic induction
electromagnetic and electrostatic induction.
none of the above
4576. The volume of copper required for an ac transmission line is inversely proportional to-
current
voltage
power factor
both b & c
4577. The surge impedance for over head line is taken as-
10-202 Ω
100-200 Ω
50-600 Ω
1000-2000Ω
4578. Objectives of power system is/are-
Cost of electrical energy per kWh is to be minimum
Rated voltage and frequency has to be supplied to the consumers
both 1 and 2
nether 1 nor 2
4579. When the load factor of a power station increases, the units (kwh) generated-
are increased
remain the same
are decreased
none of these
4580. At distribution substation voltage is stepped down to-
66kV
132kV
11kV
415/230 Volts