MCQ
4581. The effect of corona is-
increased energy loss
increased reactance
increased inductance
all of above
4582. For a distortionless transmission line --
R/L = G/C
RG=LC
RL= GC
RLGC-0
4583. Which of the following statement is true?
at higher voltage cost of transmission is reduced
at higher voltage cost of transmission is increased
at higher voltage efficiency is increased
all of these
4584. Corona is observed on--
ac transmission lines only
dc transmission lines only
both a & b
none
4585. The transmission lines generally use-
copper
all aluminium conductor
ACSR conductor
none
4586. Modern high-voltage lines are designed with a safety factor of about --
1.5
2
3
4
4587. For a single circuit 3 phase line the inductance per phase per km is of the order of--
1mH
0.2mH
10 mH
0.1 mH
4588. Dhaka Power Distribution Company Limited distributes power to-
Dhaka City and Narayanganj
Dhaka City and Saver
Dhaka City and Tongi
All of the above
4589. In de transmission, the skin effect is-
large
zero
small
depends on voltage
4590. When a load of leading pf the full load secondary voltage of a transformer is-its no-
load voltage.
equal to
greater than
less than
4591. A line which connects distributor to substation is called--
service mains
distributor
feeder
infinity
4592. Under the condition of maximum power transfer, the efficiency is --
100%
50%
75%
25%
4593. How many electricity distribution utilities are there in Bangladesh?
4
6
5
none
4594. What is to be added in an electric line to increase voltage?
Capacitor
Resistor
Inductor
All
4595. The ring main system is used in power distribution because it--
is reliable for continuity of supply
gives better voltages regulation
results in less feeder losses
all of the above
4596. The most severe unsymmetrical fault is-
single line-to-ground fault
line-to-line fault
double line-to-ground fault
none of the above
4597. Ferranti effect will not occur in which of the transmission lines?
long transmission line
short transmission line
medium transmission line
all of these
4598. As compard to overhead system, the maintenance cost of underground system is--
very high
very low
same
none above
4599. The distribution transformer is generally connected in--
Delta/Delta
Star/Delta
Star/Star
Delta/Star
4600. The line voltage on the LT side of a distribution transformer is--
400V
230V
11KV
33kV